Scope of new construction of fermentation and storage cellar > 9.3 km beverage pipe of NW DN 10 – DN 250 > 4.8 km carrier tube of the format 100 x 100 x 4 mm down to 20 x 20 x 2 mm > 15 double panels for 2 ZKL tanks product, CIP, gas piping ZKL tanks > 8 connection, entry, exit, arched garage panels > 2 blending apparatus systems > 2 pipe bridges, one indoor, one outdoor made of VA material > 12 CIP, beer and yeast pumps Process control system ProLeit V8.20, Express Version CIP system, fermentation / storage tank and basement pipes “Liqu iT” by ProLeit Special Features A particular challenge was to completely integrate the existing fermentation storage cellar into the new process control system. In a week of brew rest, it had to be converted from Siemens S5 to Siemens S7 and put back into service. A signal exchange has been set up for the new refrigeration plant so that it can also be displayed on the process control system. 12 | 13